mission
Establish appropriate infrastructure for a residential facility as long term as well as short term shelter and operate the same to provide holistic, diagnostic and vocational services to Persons with Disabilities even in absence of their parents and to build capacity for the mentally challenged persons to lead an integrated life in society and to create an enabling environment through reduction of stigma and discrimination, early interventions, rights based approach.
vision
Establish appropriate infrastructure for a residential facility as long term as well as short term shelter and operate the same to provide holistic, diagnostic and vocational services to Persons with Disabilities even in absence of their parents and to build capacity for the mentally challenged persons to lead an integrated life in society and to create an enabling environment through reduction of stigma and discrimination, early interventions, rights based approach.

1st, 2nd, 3rd & 4th Phase

Mentally challenged persons have been suffering from lack of support, goodwill, infrastructure required for protection and development of their lives.
India has three prongs problems in this regard :
Rampant lack of awareness among common people about mental disorders Lack of government initiative- no public home for rehabilitation of mentally challenged persons in absence of their parental support
AROGYA SANDHAN CHARITABLE TRUST has adopted the plan of establishing rehabilitation home in three phases. First phase will be of 2 years – from 01/01/2010 to 31/12/2011
In India, a large number of Challenged or differently-able or disabled Persons affected with Autism, Cerebral Palsy(CP), Mental Retardation(MR), Multiple Disabilities and Mental illness normally can not avail the opportunities to optimize their self-dependency as the requisite infrastructural facilities and trained human resources are not available in domestic care. Each differently able person has some inherent abilities and potentialities which are to be regularly sharpened and shaped through their exposure to a range of education, therapy, training and socialization. Whereas almost cent percent of population belonging to these categories of disorders are left with their families their developmental needs can not be fulfilled.
India has basically been suffering from Lack of awareness- 99% people do not clear idea of mental disability

FIRST PHASE OF AROGYA SANDHAN RESIDENTIAL REHABILITATION CARE CENTRE for MENTALLY CHALLENGED PERSONS

  Services to be made available Period


First Phase
Non-residential
Rehabilitation
Training & care





◘ Out Patient Department (assessment, diagnosis and counseling)
◘ Preventive awareness clinic
◘ Sheltered workshop
◘ Rehabilitation training 30 persons (Non-residential)-occupational & physiotherapy, speech and audio therapy, Dance, Music and yoga therapies, educating various skills, vocational training, Multisensory unit for stimulation,special autism unit,
◘ Respite care for 10 persons
To be completed within a period of 2 (two) year from beginning of funding cycle.
1.1.2010-31.12.
2011




1ST PHASE – DETAILS OF CONSTRUCTION
Ground Floor wing-i: 5000 sq.ft.
Reception cum and waiting hall =300 sft
Respite care room (6 bedded)=380
Respite care room (8 bedded)=380
Office room =180
Matron's single bedded room=150
Toilet 4=240
Kitchen with store=250
Lift & Stair=400
Class rooms, Therapies Rooms, 2 Doctor’s Chamber,Exhibition room & Dining =2720 Ground Floor wing ii :2000 sq ft.
With complete separation and separate stair
Hall for Class, therapy, counseling, dining =1170sq.ft.
Respite care room=260
Matron's room=150
Toilet and baths =120
Stair & Lift =300
PROJECT COST in 1st Phase
Synopsis of Project Cost

Description

Rate

Amount in lakhs in Indian rupees

Land and its development

1 bigha and 4 cottahs

15.00

Construction of ground floor

7000 sq.ft rcc construction at the rate Rs.850 per sq.ft.

59.50

Electrical transformer

 

5.00

Ceiling fans-60

Lights-100

Chair-100

Tables- 10

High benches-20

Low benches-20

Almirahs-2

Single Cot -11

 Fridge-1

Wheel chairs-2

Trolley-1

Computer-2

Channel music system

Music system for therapy

Harmonium-1

Tabla-1

Close circuit camera unit

Misc

..48

.30

.25

.30

.02

.02

.20

.55

.10

.10

.10

.46

.50

.30

.25

.05

1.5

 

5.00

Pull car (bus)

 

12.00

Ambulance

 

4.00

Contingency

 

3.00

Working Capital

 

5.00

 

Total

108.5


Sources of finance
Already investment made in purchasing land and development there on   15.00
Ambulance (already acquired)  

4.00

Equity Fund in the form of  Government/national and international grant/   89.5
     

SECOND PHASE OF AROGYA SANDHAN RESIDENTIAL REHABILITATION CARE CENTRE for MENTALLY CHALLENGED PERSONS
Residential Rehabilitation Care unit

Services in first phase

Services in Second phase

Period for completion of 2nd phase

  • Out Patient Department (assessment, diagnosis and counseling)
  • Preventive awareness clinic
  • Sheltered workshop
  • Rehabilitation training 30  persons (Non-residential)-occupational & physiotherapy, speech and audio therapy, Dance, Music and yoga therapies, educating various skills, vocational training, Multisensory unit for stimulation,special autism unit,
  • Respite care for 10 persons
  • Hydrotherapy unit for training for exercise and development of mental adjustments, physical balance, visual motor coordination and interaction skills.
  • Residential Rehabilitation training for 32 persons
  • Respite Care for 7 person

 

To be completed within a period of 2 (two) year from beginning of funding cycle.

1.1.2012-31.12.2013

 

 

 


2nd Phase details of construction
First Floor:5000 Sq.ft. Wing I
6 bedded room for Autistic featured persons, 19”x20” = sq.ft.380
6 bedded room for Mentally Retarded,9”x20” = sq.ft.380
6 bedded room for CP, 19”x20” = sq.ft.380
6 bedded room for MD, 19”x20” = sq.ft.380
2 single bedded room with toilet = 240
4 bedded room for respite care, 15”x20” = sq.ft.300
Room for Superintendent = 200 sq.ft.
Double bedded Isolation Room 200 Sq. ft.
Toilets 6 and Baths 2 = 350 sq.ft.
Stair and lift =400 sq. ft.
Common space available=1790 sq.ft
First Floor wing ii :2000 sq ft.
With complete separation and separate stair
One 6 bedded room 380 sq.ft. One bouble beded room respite care=160
One single room for isolation=80
Matron’s single room flat cum office =150 Toilet and baths =120
Stair & Lift =300
Common space 300
PROJECT COST in 2nd Phase
Synopsis of Project Cost

Description

Rate

Amount in lakhs of rupees

Hydrotherapy unit 600 sq.ft with pumping facility

 

3.00

Construction of first floor

With 120 ft x 6 ft ramp

7000 sq.ft rcc construction at the rate 1000 per sq.ft.

70.00

Furnishing for

32 residents

2 matrons

7 respite care

3 isolation

 

Rs.25000 each

11.00

Working capital

 

5.

 

 

 

 

Total

89.00


3RD /FINAL PHASE OF AROGYA SANDHAN RESIDENTIAL REHABILITATION CARE CENTRE for MENTALLY CHALLENGED PERSONS
Residential Rehabilitation Care unit
Services in first phase

Services in Second phase

Services in 3rd phase

Period for completion of 3rd phase

Out Patient Department (assessment, diagnosis and counseling)

Preventive awareness clinic

Sheltered workshop

Rehabilitation training 30  persons (Non-residential)-occupational & physiotherapy, speech and audio therapy, Dance, Music and yoga therapies, educating various skills, vocational training, Multisensory unit for stimulation,special autism unit,

Respite care for 10 persons
Hydrotherapy unit for training for exercise and development of mental adjustments, physical balance, visual motor coordination and interaction skills.

Residential Rehabilitation training for 32 persons

Respite care 7

 

Residential Rehabilitation training&care for 32 persons

Respite care 7

To be completed within a period of 2 (two) year from beginning of funding cycle.

1.1.2013-31.12.2015

 

 

 

 


3rd Phase details of construction
2nd Floor:5000 Sq.ft. Wing I
6 bedded room for Autistic featured persons, 19”x20”= sq.ft.380
6 bedded room for Mentally Retarded,9”x20”= sq.ft.380
6 bedded room for CP, 19”x20”= sq.ft.380
6 bedded room for MD, 19”x20”= sq.ft.380
2 single bedded room with toilet=240
4 bedded room for respite care, 15”x20”= sq.ft.300
Room for Superintendent =200 sq.ft.
Double bedded Isolation Room 200 Sq. ft.
Toilets 6 and Baths 2 =350 sq.ft.
Stair and lift =400 sq. ft.
Common space available=1790 sq.ft
2nd Floor wing ii :2000 sq ft.
With complete separation and separate stair One
6 bedded room 380 sq.ft.
One bouble beded room respite care=160
One single room for isolation=80
Matron’s single room flat cum office =150
Toilet and baths =120
Stair & Lift =300
Common space 300
3rd Floor:7000 Sq.ft.Wing I
Seminal Hall - 4000 sq. ft.
Guest room- 2 Double bedded 1200
2 single bedded 800
Store room-200
Stair & life 700
PROJECT COST in 3rd Phase
Synopsis of Project Cost

Description

Rate

Amount in lakhs of rupees

 

 

 

Construction of 2nd & 3rd floor

 

14000 sq.ft rcc construction at the rate 900 per sq.ft.

126.00

Furnishing for

32 residents

2 matrons

7 respite care

3 isolation

Seminar Hall

Guest Room

Rs.25000 each

11.00

05.00

Working capital

 

5.00

 

Total

147.00

SOURCES OF FINANCE

 

Equity in the form of GRANTS/DONATIONS

147.00

INVESTMENT already made

 

 

Total

147.00


ON COMPLETION - TOTAL SERVICES & TOTAL COST AT THE END OF THREE PHASE DURING 6 YEARS

AROGYA SANDHAN RESIDENTIAL REHABILITATION CARE CENTRE for MENTALLY CHALLENGED PERSONS

Residential Rehabilitation Care unit


Services in first phase 2years(1.1.10-31.12.11)

Services in Second phase2years (1.1.12-31.12.13)

Services in Third phase

2years(1.1.14-31.12.15)

TOTAL 6years(1.1.10-31.12.15)

Out Patient Department (assessment, diagnosis and counseling)

Preventive awareness clinic

Rehabilitation training 30  persons (Non-residential)-occupational & physiotherapy, speech and audio therapy, Dance, Music and yoga therapies, educating various skills, vocational training, Multisensory unit for stimulation,special autism unit,

Respite care for 10 persons

Hydrotherapy unit for training for exercise and development of mental adjustments, physical balance, visual motor coordination and interaction skills.

Residential Rehabilitation  for 32 persons

Respite care 7

 

Residential Rehabilitation  for 32 persons

Respite care 7

 

RESPITE CARE:31

 

Non residential Rehabilitation care:30

 

Residential Rehabilitation

Care:64


Construction

In 1st phase

Construction

In 2nd  phase

Construction

In 3rd  phase

Total construction

Ground Floor

7000 sq.ft.

First Floor

7000 sq.ft. with ramp & 2 lifts with hydrotherapy unit at ground floor

2nd &3rd floor 7000 sq.ft.each totaling 14000 with 2 lifts,Seminal hall,Guest room

 

28000 sq.ft with ramp,two lifts,two stair case, and hydrotherapy unit ,Seminal Hall, Guest room

2years(1.1.10-31.12.11)

2years (1.1.12-31.12.13)

2years(1.1.14-31.12.15)

6years(1.1.10-31.12.15)

TOTAL PROJECT COST ( Rupees in lakhs in Indian currency)

COST IN 1ST PHASE

COST IN 2ND PHASE

COST IN 3RD

PHASE

TOTAL COST

Rs.100.5(fixed cost)

Rs.84.00(fixed cost)

Rs.142.00(fixed cost)

Rs.326.5(fixed cost)

Rs.8.00

Rs.5.00

Rs.5.00

Rs.18.00

Total 108.5

Total 89.00

Total 147.00

GRAND Total Rs. 344.05


For further details please contact:-

Mr Anil .Kumar .Jana – President -91- 9331031505
Mr Niranjan Biswas, General Secretary -91-9331031650
Phone : 9133-24161465,24165725,24167468.
Email- arogyasandhancharitable@gmail.com, arogyasandhan@gmail.com
Visit our main web at www.arogyasandhan.org -->